| 1 May choose the brush painting, roll coating and aerial spraying. The brush painting and roll coating have better effect.
2 The construction temperature within 1 °C ~40 °C, when the coating piece's temperature is higher than 40 °C, because the coating will volatilize too fast and causes it does not have time to respond, will affect the effect. When the coating piece's temperature is lower than 0 °C, the coating possibly will coagulate, is unable to construct.
3 Construct in the rainy days, the coating can wash away by the rain, will affect the effect.
4 After the coating dried, while congeals primer layer, it will separate out the white educt which is very light and very easily to be blown away, also can use the brush or the cleaning rag to erase gently.
5 After the coating brushes, it will at once response with the rust (deoxygenation ), after 20 - 30 minutes, will form the paint film, after 2 - 3 hours, form the hard mask.
6 When the temperature is lower than 0 °C(generally below -2 °C) the formulated concentrate will coagulate, but it won't affect the quality. Can use as usual after melted.
7 The formulated concentrate should not store in the places without ultraviolet light.
|